Madison County Sanitary Sewer and Water District
New Construction Process

The following process shall be used as a guideline for the construction of homes or businesses within the Madison County Sanitary Sewer and Water District operating areas. New construction packets are also available at the Billing Office located at 825 US Route 42 NE, London, Ohio. 

1. Property owner will submit a plot plan and copies of the approved signatures from all required regulatory agencies prior to submitting to the Madison County Building and Zoning for approval. 
2. Once the Madison County Sanitary Sewer and Water District approves the water and/or sanitary sewer connections, the District will issue a Water Permit and/or Sewer Permit upon payment in full of the connection fees. No work may be performed for the connection of a water and/or sewer connection until all approvals are finalized and fees are paid in full. 
3. Water and/or sewer connections must be completed by an approved installer by the Madison County Sanitary Sewer and Water District. The property owner is responsible for all costs associated with the water and/or sewer line connections. 
4. Prior to performing any connections to District water and/or sewer lines, the installer must contact the Madison County Sanitary Sewer and Water District to schedule the work to be completed. Once work is completed the installer must contact the District for final inspection of the completed work. 

For areas served by a low pressure grinder system, additional steps must be taken in the process:

a. The property owner must purchase the approved Madison County Sanitary Sewer and Water District grinder pump system and may only use a system from an approved manufacturer. A list of approved systems is available at the Billing Office located at 825 US Route 42 NE, London, Ohio. It is recommended the grinder pump system be purchased at the beginning of the construction process.
b. Prior to installing the grinder pump system, the property owner must contact the Madison County Sanitary Sewer and Water District to inspect the construction site at which time the property owner is instructed on the location of the grinder pump collection basin and electric control panel. 
c. The grinder pump system must be installed by a Madison County Sanitary Sewer and Water District installer. A list of the approved installers is available at the Billing Office located at 825 US Route 42 NE, London, Ohio. Installation includes tapping the sewer main trunk line, installing the collection basin, installing the electrical control panel and completing all electrical connections from the home/business owner to the grinder pump, connecting all sanitary lines including the inlet line, and discharge line to main trunk line, install required fittings and install grinder pump into collection basin. All work to be completed within the Madison County Sanitary Sewer and Water standards and is completed at the cost of the property owner. 
d. Once all work is completed by the approved installer, the Madison County Sanitary Sewer and Water District personnel will inspect the entire system and place the grinder pump into service. 
 
 

Grinder Pump Unit Contact Information For New Construction

 

Disclaimer

This webpage is consistently undergoing change and is not warranted for content or accuracy. Madison County cannot be held liable for errors or omissions in the information. Madison County makes no warranties, expressed or implied, concerning the accuracy, completeness, or reliability of this information.